Top Golf Baton Rouge

Under Arco Murray we gave louisiana its first top golf. On this job we had a succesful completion date and used many of our services.

the exterior involved framing around a structural steel foundation using studs as long as 40 foot in length. On top of the studs we sheathed the building, waterproofed it, and provided a stucco finish around the building.

In the interior we erected interior wall assemblies that consisted of metal drywall studs, insulation, and sheetrock. In the main bar area we installed a special suspended wood ceiling. this project included other specialties such as rigid x insulation in main lobby, and FRP in all kitchen and bathrooms areas.